메시지를 남겨주세요
곧 다시 연락 드리겠습니다!
귀하의 메시지는 20-3,000 자 사이 여야합니다!
이메일을 확인하십시오!
정보가 많을수록 커뮤니케이션이 향상됩니다.
성공적으로 제출되었습니다!
곧 다시 연락 드리겠습니다!
메시지를 남겨주세요
곧 다시 연락 드리겠습니다!
귀하의 메시지는 20-3,000 자 사이 여야합니다!
이메일을 확인하십시오!
모델 번호: | CDDW1530 | 로드 용량: | 1~1.5t |
---|---|---|---|
부하 중심: | 500mm | 리프트 높이: | 1600-3000mm |
무게: | 495kg | 전원 유형: | DC 전원 |
정격 하중 용량: | 1.5톤 | 패키지 크기: | 182x90x213.cm |
구동 속도: | 50.0/5.0 MM/S | 리프팅 속도: | 140/135 mm/s |
하강 속도: | 150/155 mm/s | 맥스 증감: | 7/5 ° |
운전 모터: | DC/0.75 kW | 리프팅 모터: | DC/2.2 kW |
배터리 용량: | 24/80/100 V/AH | ||
강조하다: | Compact Size Electric Pallet Stacker,Adjustable Cab Electric Forklift,1 Year Warranty Walkie Stacker |
This walkie stacker is designed for easy operation, requiring only basic training to master, making it suitable for various workers. Its compact size and light weight allow for excellent maneuverability in tight spaces, ideal for warehouse and factory environments.
Model: CDDW10 CDDW15 | |||
---|---|---|---|
Features | Drive system | Battery | |
Driving mode | Walkie | ||
Load Capacity | Q | KG | 1000 |
Load Center | C | MM | 500 |
Weight | Weight(With battery) | KG | 480/495/515/535 |
Wheels | Material | PU | |
Size | Lifting Height | H3 | 1600/2000/2500/3000/4000 MM |
Performance | Driving Speed (Empty/Full Load) | 5.0/5.0 MM/S | |
Battery | Capacity | 24/80/100;Li/gel V/Ah |
Equipped with domestic famous KAD control handle featuring functional buttons that sensitively control UP/DOWN, FORWARD/BACKWARD movements. Uses Curtis brand accelerator for safe operation.
Essential for warehouses with insufficient lighting conditions.
Includes reverse rearview mirror and buzzing sound alarm system for enhanced safety - features often omitted by competitors to reduce costs.
High-strength 3-stage mast capable of supporting heavy loads at 4-4.5m heights.
A: Generally, we pack our goods in paper package and Iron pallet. We can pack the goods in your branded boxes after getting your authorization letters.
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance. Or As negotiated.
A: EXW, FOB, CFR, CIF, DDU.
A: Generally, it will take 5 to 30 days after receiving your deposit. The specific delivery time depends on the items and the quantity of your order.
A: Yes, we have 100% test before delivery.
A: 1. We keep good quality and competitive price to ensure our customers benefit;
2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.